| L5 |
Installation of air-conditioning system (without ductworks and at Non-Designated Area) |
| I. |
Structural Requirements :
- Each panel of brickwall can only allow a maximum 110kg of ACU to be mounted onto. The QP engaged by tenant/lessee is to relocate some of the ACUs to ensure that the total weight does not exceed 110kg on each brickwall panel
- To show in the structural drawings, the weight of the ACU, installation details ie type and size of bolts, penetration depth and spacing of bolts, weld size, steel bracket size and length/thickness of cantilever brackets
- To show new and existing ACUs to be carried by an existing beam or a single brickwall panel
- The location of the ACUs / FCUs must be clearly marked, labelled and indicated in the floor layout plan
- Refrigerant and discharge pipe must be indicated clearly on plan.No pipe is allowed to penetrate existing column /beam
- QP is to refer to Seventh Schedule of the Building Control Regulations or HDB InfoWEB for installation details of ACU with weight less than or equal to 110kg
- QP(ST) is to provide design calculations for the air-condensing bracket installation details which depart from the Seventh Schedule of the Building Control Act and Regulations (2004) (for ACU< or = 80kg) and HDB InfoWEB at www.hdb.gov.sg (for ACU < or = 110kg).
- For ACU resting on floor slab,QP engaged by the tenant/lessee is to produce calculation to show individual weight of the ACU is less than the existing imposed load of the floor slab, otherwise the QP is required to design a concrete plinth or steel plate to spread out the load to less than the existing imposed load
- The size of the proposed concrete plinth or steel plate is to be indicated clearly in the structural drawings
- Penetration of bolts/anchors shall not exceed 40mm into RC slab.
- Suspension of ACU from the ceiling, suspension of FCU with weight more than 35kg from the ceiling and Installation of ACU on canopy or refuse chute wall are not allowed.
- No hacking or coring to form recess and opening in existing structure member is allowed for embedment or running of any pipes.
|
| II. |
Additional structural requirements for ACU resting on floor
- A minimum 500mm gap between the ACUs must be maintained and the drawing submitted shall indicate the size of the concrete stump or plinth for supporting the ACUs.
- The QP(ST) has to produce calculation to show that the total uniformly distributed load of the ACU is less than the design imposed load of the existing floor slab. Otherwise the QP(ST) is required to design a concrete plinth or steel plate to spread out the load to less than the design imposed load of the existing floor slab and submit the calculations.
- The size of the proposed concrete plinth or steel plate is to be indicated clearly in the structural drawings.
Note: Self-weight of the proposed steel plate / concrete plinth should be considered in the calculation. |
| III. |
Additional structural requirements for FCU with weight more than 35kg
- The FCU should be suspended from steel members spanning the existing RC elements (beam/column/wall) or supported by steel brackets fixed on RC beam/RC column/RC wall.
- The QP (ST) has to submit structural design calculations for the installation details.
|
| IV. |
Other Requirements
- If the air-conditioner is to be installed on the exterior of the industrial unit or any part of the air conditioner projects outwards from the unit, the BCA trained installer must submit a copy of the "Self declaration for the installation of air conditioners" to IPD for record.
- The Lessee/ Registered Tenant is responsible to maintain the external wall surfaces free from stain.
- Approval must be obtained from IPD for installation of ACU at common area.
- Air-condensing units must be installed at least 2.4m from the ground level.
- All air-conditioners must be provided with proper drainage system for the condensed water to be located in the premises. The air conditioning must be maintained in proper working condition at all times so as not to cause any disturbance or nuisance to nearby occupants. Failures to do so will render the approval granted under Lodgement be revoked and the Lessee/RT will have to stop the use of such system.
- For premises that have more than 2 nos of ACUs, Lessee/Tenant & QP are required to incorporate preventive measures against possible heat nuisance in the design before installing the ACUs to minimise the effect of rising hot air. In the event of heat nuisance affecting to the nearby neighbours, Lessee/Tenant & QP are required to take immediate action to alleviate the heat nuisance or remove any excessive ACUs upon the instruction from the competent authorities. Failure to do so will render the approval granted under Lodgement to be revoked and the Lessee/RT will have to relocate the ACU system.
- Wall mounted installation must be within the existing recess area and should be screened off with aluminium louvred screen if there is more than one ACU.
|
| V. |
Mechanical Electrical Requirements: The installation shall comply with CP 13: Code of Practice for Mechanical Ventilation and Air-Conditioning in Buildings. |